Products

DOUBLEBOX PLUS Series

DOUBLEBOX PLUS Series Image

Prefabricated lifting station for wastewater in compliance with
EN 12050-1/2 standard

Easy installation:

  • Installation is quick and easy
  • For the single-phase versions: connect the pipes and the electrical cables
  • For three-phase versions: need to connect the control panels also
  • The new Doublebox is provided with side handles for ease of handling
  • pre-installed delivery pump and unions

Doublebox plus can be installed on the floor or buried in a suitable structure following instructions in the “Instructions and Operative Manual”
Special versions equipped with delivery pipes, ball check and gate valve
Special versions equipped with sliding device and non-return ball valveSpecifications

The station is equipped with:
Polythene basin with a capacity of 550 liters, equipped with two threaded pedestrian covers (100 kg max).
Cable glands for power supply cables (and floats)
2x Rp 1”1/2 or 2” delivery pipes with fast connection and ring nut for easy disassembly of the pumps or with sliding device
8 fast connections: 4x DN110 for inlet; 2x DN50 for ventilation and 2x DN65 for cable connection
1x DN50 fast connection for the manual pump
2x DOMO or DL submersible pumps, vortex or channel impeller type or with grinder device
QXR2 control panel for three phase versions
3 rubber seal: 1x DN110; 1x DN50 and 1x DN65 mm

Ecological Solutions:

  • Tank made from 100% recyclable polyethylene
  • Airtight anti-pollution tank, pursuant to European standard EN 12050

Easy maintenance and Repair:

  • Tried and tested pump technology
  • Pump quick and easy to remove thanks to the ring nut located near to the cover

Accessories

  • Ball check valves
  • Alarm kit
  • Manual pump + seal
  • Seals kit

DOUBLEBOX PLUS Series

DOUBLEBOX PLUS Series Image

Prefabricated lifting station for wastewater in compliance with
EN 12050-1/2 standard

Easy installation:

  • Installation is quick and easy
  • For the single-phase versions: connect the pipes and the electrical cables
  • For three-phase versions: need to connect the control panels also
  • The new Doublebox is provided with side handles for ease of handling
  • pre-installed delivery pump and unions

Doublebox plus can be installed on the floor or buried in a suitable structure following instructions in the “Instructions and Operative Manual”
Special versions equipped with delivery pipes, ball check and gate valve
Special versions equipped with sliding device and non-return ball valveSpecifications

The station is equipped with:
Polythene basin with a capacity of 550 liters, equipped with two threaded pedestrian covers (100 kg max).
Cable glands for power supply cables (and floats)
2x Rp 1”1/2 or 2” delivery pipes with fast connection and ring nut for easy disassembly of the pumps or with sliding device
8 fast connections: 4x DN110 for inlet; 2x DN50 for ventilation and 2x DN65 for cable connection
1x DN50 fast connection for the manual pump
2x DOMO or DL submersible pumps, vortex or channel impeller type or with grinder device
QXR2 control panel for three phase versions
3 rubber seal: 1x DN110; 1x DN50 and 1x DN65 mm

Ecological Solutions:

  • Tank made from 100% recyclable polyethylene
  • Airtight anti-pollution tank, pursuant to European standard EN 12050

Easy maintenance and Repair:

  • Tried and tested pump technology
  • Pump quick and easy to remove thanks to the ring nut located near to the cover

Accessories

  • Ball check valves
  • Alarm kit
  • Manual pump + seal
  • Seals kit